

Don't miss it, The beautiful date center color management
So many beautiful and greasy DC(date center) color management real-life pictures, I hope everyone will like it. Our raised floor is an indispensable part of the data center.
2020-10-14 Read More
Happy National Day and Mid-Autumn Day!
Happy National Day and Mid-Autumn Day!
2020-09-30 Read More
T1, T2, T3, T4 grade standards for IDC data center
Introduction of T1, T2, T3, T4 grade standards for IDC data center computer room construction
2020-07-08 Read More
Abeite raised floor and Abet Laminati, A perfect match!
Abeite raised floor and Abet Laminati, A perfect match!
2020-06-08 Read More
Why the load of Abeite calcium sulfate raised floor is so high?
Why the load of Abeite calcium sulfate raised floor is so high?
2020-05-28 Read More
How to reduce the installation loss of raised floor in the project?
How to reduce the installation loss of raised floor in the project?
2020-05-28 Read More
How much weight can a raised floor support?
Calculate the floor loads for your server with these formulas.A floor loading assessment is the evaluation of the concrete subfloor, not the raised floor. The weight of the raised floor is considered ...
2020-04-21 Read More
What does raised floor mean?
A raised floor is a data center construction model in which a slightly higher floor is constructed above the building's original concrete slab floor, leaving the open space created between the two for...
2020-04-21 Read More
Automatic Production of Abeite raised floor
Abeite raised floor is always prepared for our customers.
2020-04-01 Read More
Notice of new date and location of DOMOTEX asia/CHINAFLOOR 2020
Notice of new date and location of DOMOTEX asia/CHINAFLOOR 2020
2020-02-26 Read More
Notification of resumption---Abeite raised floor
Our factory resume work on Feb 21th, Any call, video meeting and orders are welcome.
2020-02-21 Read More
2020 Chinese New Year Holiday Notice
2020 Chinese New Year Holiday Notice
2020-01-16 Read More



















